Can MAC do work? — fleet assessment, 2026-08-02

An evidence-based answer to a direct question: does this framework actually complete work, is it moderately efficient at it, and is the design sound enough to keep?

All figures are drawn from the live hub ledger (7,678 tasks), the mac git history since 2026-07-01, and a controlled twelve-task experiment run on 2026-08-02.

Verdict

Keep it, and the fix is narrow. The execution core works and is efficient. The losses concentrate in one design decision — automatic decomposition of tasks into dependency trees — plus a set of generators that manufacture work nobody wants. Both are removable without touching the part that works.

1. It produces real work

Commits to mac since 2026-07-01, by author:

Author Commits
MAC fleet 484
operator (primary identity) 327
MAC certifier canary 237
operator (secondary identity) 108
other fleet identities 16

Roughly 737 fleet-authored commits against 435 human ones. 527 of the 1,196 commits in the window reference a task id. This is not a system that does nothing.

2. It is efficient on independent work

Metric Value
Attempts per completed task 1.21
Median created → completed 1.9 h (p75 8.4 h, p90 30 h)
Peak throughput 80–229 completions/day, mid-July

Given a self-contained task, the fleet does it once, quickly, and lands it.

3. The decisive number: dependencies

Completion yield by dependency count, across all 7,678 tasks:

Dependencies Tasks Completed
0 2,945 29.3%
1 2,888 5.5%
2 1,012 2.0%
3+ 833 2.0%

One dependency drops completion 5.3x. Two is effectively terminal.

The system attaches them by default:

  • 62% of all tasks carry dependencies
  • 50% are children of a decomposition
  • 82% of the waiting pool are decomposition children

The controlled experiment

Twelve tasks were filed on 2026-08-02, each verified against current main, self-contained, with zero dependencies and capabilities the fleet advertises. The fleet claimed them within seconds and put seven agents to work.

Zero completed.

One is representative: a task to fix a CARGO_HOME probe was decomposed by the planner into three children — implement, test, verify — with the parent made dependent on all three. One child failed. The parent is now stranded permanently.

That is the failure in one observation: the system converts a task it could do into a tree it cannot.

4. Where the remaining loss goes

Generators that manufacture unwanted work

Completion yield by task origin:

Origin Tasks Yield
direct_task 4,419 20.4%
environment_prerequisite 594 9.6%
contract_prerequisite 599 7.7%
task_system_reset 137 2.9%
crash_observer 50 2.0%
dream_low_confidence_repair 1,396 0.3%
self_heal 46 0%

3,259 tasks — 42% of everything ever filed — came from generators whose combined yield is near 3%.

The dream scanner's replacement records the verdict in its own source: "in forty days of production that produced 154,273 artifacts… and filed 1,259 investigation tasks of which 4 completed." It has been deleted. The others have not.

Failures that were never failures

Of 3,245 tasks in failed before triage:

Cohort Count What happened
Cascade 1,348 Never ran; auto-failed when a dependency died, under a rule since removed
Own failure, budget left 1,508 Stopped early
Genuinely exhausted 389 Tried until the retry budget ran out

Only 12% actually exhausted their attempts. Triage of all 1,348 cascade tasks against current main found 85% obsolete (843 moot, 308 already done), 13% still wanted, 2% needing a human decision.

Overall, 69% of all execution attempts ended in a failed task (2,862 against 1,281).

5. What is genuinely working

This constrains the fix, so it is worth stating plainly.

  • The verification contract. In the experiment, one task ran and the agent reported "56 passed total". The contract rejected it: pushed=false, no changed files. It correctly refused to bank work that was never landed. A share of the 547 verification_contract_failed results is this gate doing its job.
  • Fail-closed execution. The executor refuses to launch without a sandbox. It cost tasks on two misconfigured workers, but refusing was correct.
  • The recursion guard. 155 repair_task_exhausted_no_recursion results are repair-of-repair chains being correctly dead-lettered.
  1. Stop auto-decomposing tasks. Dependencies cost 5.3x completion and buy nothing measurable. If decomposition is kept, a child's failure must reopen the parent rather than stranding it — 493 tasks are waiting today, 82% of them decomposition children.
  2. Retire or gate the remaining generators — self_heal (0/46), crash_observer (1/50), task_system_reset (4/137). The dream-scanner deletion is the precedent.
  3. Verify the execution boundary at registration, not at first task. A worker whose startup self-test passes while it cannot execute anything is the failure this assessment began with.

At the observed 29.3% independent-task yield, with generator noise removed, roughly one filed task in three completes at 1.2 attempts. That is a system worth running.

7. Limits of this analysis

  • 361 of 1,061 completions record attempt_count=0; some are administrative force-completes, so raw completion counts are slightly generous.
  • Commit authorship proves work landed, not that it was good work. Fleet commit quality was not audited.
  • The dependency/yield correlation is strong but not proof of causation: harder tasks may attract more dependencies. The twelve-task experiment is the causal evidence, and n=12 is small.
  • One repository, one fleet, roughly six weeks.

Bottom line

The engine is sound. The scheduling and task-generation layers wrapped around it are losing the work, and both were bolted on rather than being load-bearing. The single highest-value change is to stop turning one task into four.